JULY 2005
SOLICITATION FOR OFFERS
OUTPATIENT CLINIC
SFO NO. V101-183R-xxx-xxx-xx
[INSERT LOCATION OF FACILITY]
3.23.1.2 STRUCTURAL:
The Structural drawings shall show all structural members and details, including type of construction (steel,
concrete, etc.), size of structural members, and connection details. Submit calculations for gravity and
lateral (wind/seismic) load requirements. Submit structural specifications and calculations.
3.23.1.3 ARCHITECTURAL:
Architectural drawings: Submit fully dimensioned, 1/8 inch scale floor plans showing all revisions required
by comments from the design development phase. Submit interior details, elevations, and sections.
Submit a complete and coordinated finish schedule. Submit completed building sections, wall sections,
and exterior elevations that show finish floor elevations and indicate all building systems, materials, and
future expansion, if applicable. Submit completed, coordinated reflected ceiling plans for entire building,
indicating all ceiling mounted equipment, lighting fixtures, air diffusers, registers, tracks, etc. Submit
completed 1/4-inch scale equipment plans, plus equipment elevations and details. Submit all necessary
and coordinated details and specifications. Submit drawing(s) for all graphics and signage that are part of
the solicitation.
3.23.1.4 FIRE PROTECTION/LIFE SAFETY:
Submit 75 percent complete fire protection drawings, including the following: //details of the fire pump
system, including elevation and isometric detail of fire pump;// //details of the stairwell sign indicating
stairwell number, floor number, and upper and lower floor terminus of stairwell;// door and window
schedule indicating fire rating and whether fire rated glazing will be provided; //Interconnection of elevator
controls with fire alarm system;// //Interconnection of kitchen fire extinguishing and fire pump system to the
fire alarm system;// zoning of each fire alarm initiating device; single line riser diagram for the fire alarm
system; detail of annunciator panel; //height and configuration of storage racks and shelving if provided
with contract.// Provide reference note to HVAC drawings that indicate interconnection HVAC system
(dampers, fans) with duct smoke detectors and/or fire alarm system. Provide final calculations. Submit
fire protection specifications.
3.23.1.5 MECHANICAL:
Provide complete and final engineering calculations of all systems. In addition to specifications, provide
complete selection data, including catalogue cuts and calculations, for all HVAC equipment and drawings
showing all equipment schedules. Complete the coordination requirements with fire protection, electrical,
plumbing, architectural (louvers, ceiling access panels, reflected ceiling plans, etc.), and structural work
(operating weights of ceiling and floor mounted equipment, concrete and steel supports, roof and floor
openings, etc.). Submit 75 percent complete HVAC floor plans for all areas showing all ductwork and
piping at 1/8 inch scale. Submit 75 percent complete HVAC floor plans for all mechanical equipment
rooms with at least two cross-sections taken at right angles to each other at 1/4 inch scale. Show all
equipment located on roof and/or grade.
3.23.1.6 PLUMBING:
Submit 75 percent complete and coordinated drawings to include Riser diagrams, Legend, notes and
details. Submit specifications and final calculations.
3.23.1.7 ELECTRICAL:
Show all new services to building, transformers, street lighting, grounds lighting, and the utility service
point and meter location on the electrical plot plan. Complete the one-line riser diagram including all
conduit, cable, ground wire, and equipment sizes. Indicate nominal transformer impedance. Show
signal, telephone, security, and fire alarm risers; identify all devices and locations. Complete the building
electrical floor plans. Indicate all lighting and power circuit systems. Show motor protective devices, and
controller and feeder sizes. Locate all panels, transformers, and other major electrical components.
Provide specifications and final calculations. Provide written approval by the utility company of the design
of the electrical incoming service. Furnish copies of pertinent correspondence.
Part I: Basic Solicitation Requirements Page 35 of 169
Lessor __________ Gov't. __________
__________ of __________ Pages