03-98
D.
GENERAL CONTRACT REQUIREMENTS
Spec Writer Note: Edit and include
project-specific requirements.
D1.
Design-Build (DB) Team's Responsibilities
Intent:
The DB contractor shall construct the project in accordance
with the VA RFP documents and approved construction documents prepared
by the DB A/E within the required time period (contract length).
8
Attachment