03-98
C. Project Record Drawings:
The DB team will maintain a set of
construction documents (field as-built drawings) to record actual
construction changes during the construction process as required by the
RFP specifications.
The project record drawings will be available for
review by the VA Resident Engineer at all times.
D4.
Project Close-out
The DB team shall comply with the requirements in the "General
Conditions", 01001, and "General Requirements", 01010, for submission of
final RFP as-built drawings, shop drawings, manuals, and other documents
as noted.
- - - END - - -