03-98
B3.
Selection Criteria and Weightings
A. Proposals will be evaluated on the basis of both cost and technical
considerations.
In descending order of importance, evaluations will be
based on cost, construction management, past experience, and schedule;
B. Award will be made to the offeror whose proposal is most advantageous to
the government, price, and other factors considered.
Offerors are
advised that if the technical proposals are essentially equal, award
will be made on the basis of the lowest price; and
C. The weightings will be based on a total of 100%, with the cost
evaluation at 50% and the technical evaluation at 50%. The weightings
are as follows:
1. Cost Evaluation = 50% of total:
Formula = [A/B] X C = D
A = Lowest price proposal (maximum points)
B = Each remaining price proposal
C = Maximum points for price
D = Point value for each remaining price proposal
2. Technical Evaluation = 50% of total:
a. Construction Management:
(20% of total);
b. Past Experience:
(15% of total); and
c. Schedule:
(15% of total).
D. Responsibility determination will be made in accordance with FAR 9.1,
responsible Prospective Contractors.
B4.
Cost Evaluation
Offers shall be prepared for a _____ day schedule.
Offeror's may
propose an alternate schedule, in addition to the ______ day base
schedule, which will also be evaluated per article A2.3, Selection
Criteria and Weightings.
B5.
Technical Evaluation
A. Construction Management - Design-Build Team engineering/technical
consultants shall be the subcontractor of the Design-Build Architect
Engineer (DB A/E), not the Design-Build contractor or sub contractors,
assuming that the DB A/E and DB contractor are not one and the same
firm.
The Offeror shall demonstrate relevant experience of key
personnel to be involved in this procurement.
Supply biographical data
including; name of individual, company position, years with the company,
work and educational background, tasks to be assigned on this project,
percentage of work week to be committed to this project:
1. Key personnel shall include:
a. Project Manager;
3