03-98
C3.
Technical Proposal Requirements
A. The proposal shall meet the following requirements and evaluation will
be based upon the criteria mentioned in article A2.5, Technical
Evaluation;
Spec Writer Note: Add factors like:
a. What structural system does the Offeror
intend to utilize?;
b. What foundation system does the Offeror
intend to utilize?; and
c. What roof systems does the Offeror
intend to provide?
B. The Offeror shall provide a narrative description of the proposed
building system or technology; and
C. Construction Management:
The Offeror shall demonstrate the relevant
experience of key project personnel.
Supply biographical data for key
personnel for both the design and build portions of the work.
Biographical data shall include the following:
name of individual,
company position, years with the company, work and educational
background, and position that the individual will hold in regard to this
contract:
1. Key personnel shall include:
a. Overall Project Manager;
b. Architect;
c. Structural Engineer;
d. Mechanical Engineer;
e. Electrical Engineer;
f. Certified Industrial Hygienist;
g. Qualified Fire Protection Engineer;
h. Construction Project Manager; and
i. Construction Superintendent.
2. Indicate which individuals are used for the design phase and which
are used during the construction phrase.
Indicate what percentage of
each individual's time would be committed to the project during both
the design and construction phases.
D. Past (Corporate) Experience:
The Offeror shall demonstrate prior
corporate experience in the last five years with Design-Build. In
describing project design and construction experience, provide the
following information:
1. Project location;
2. Project owner;
3. Name and telephone number of Owner's contact person;
4. Design Architect and Engineers;
6
Attachment