03-98
construction specifications.
Since data stored on electronic media
can deteriorate undetected or be modified without the RFP
Architect/Engineer's knowledge, the CADD drawing files are provided
without warranty or obligation on the part of the RFP
Architect/Engineer as to accuracy or information contained in the
files.
All information in the files shall be independently verified
by the user.
Any user shall agree to indemnify and hold the RFP
Architect Engineer harmless from any and all claims, damages, losses,
and expenses including, but not limited to, attorney's fee arising
out of the use of the electronic files;
9. The DB A/E who prepares the construction documents shall be
professional architect/engineers licensed in the state in which the
design work is completed.
The professional seal indicating such
license by the state shall appear on the documents.
The architect
whose seal is shown will be known as the architect of record.
The DB
A/E shall certify compliance with the VA RFP; and
10. The construction drawings shall comply with the VA RFP and be
prepared to include such details that the project can be constructed.
The construction record drawings shall be completed in AutoCAD.
Construction shop drawings are not required to be completed in
AutoCAD.
Drawings shall be plotted at scales no smaller than those
used for equivalent information in the RFP (solicitation)documents.
B. Construction Drawings:
The construction drawings shall include a
coordinated set of:
1. Civil engineering drawings including grading and drainage plans,
paving plans, utility plans, schedules, and details;
2. Landscape drawings including landscape plans, plant schedule and
list, special landscape elements, proposed materials to be used for
each special landscape element, and details;
schedules, and details, including general notes and all calculations;
4. Architectural drawings including floor plans, building elevations,
building sections, wall sections, reflected ceiling plans, stair
details, toilet and bath details, cabinetry elevations, door
schedules and details, window schedules and details, room finish
schedules, loading dock details, auto transport and pneumatic tube
details, and other details;
5. Fire protection drawings including floor and roof plans, riser
diagrams, equipment schedules, plumbing fixture schedules, and
10
Attachment