N. ESTIMATING: Submit the following:
Estimating Requirements
Level 1
Level 2
Submit Level "B" Summary Sheet with detail backup sheets
O. SPECIFICATIONS: Submit the following:
Specification Requirements
Level 1
Level 2
Fully developed specification package suitable for issue with
Request for Proposal documents.
P. SPACE PLANNING: Submit the following:
Space Planning Requirements
Level 1
Level 2
Provide a tabular Space Accounting Summary Table with
columns entitled Departmental Function, H-7610 Requirements,
Approved Space Program [Net Square Meters (Feet), Variance
Between H-7610 and Approved Space Program, Departmental
Conversion Factor, Planned Departmental Gross Square
Meters (Feet); column totals; Total Project Net to Gross Factor,
Designed Net Area, and Variance From Approved Space
Program Net Area for each department or service. Also, list
separately the area required for additions to the program,
unassigned space, major circulation (inter-departmental
corridors, stairs, elevators), major mechanical and electrical
spaces, exterior walls, connecting corridors to other buildings,
space for future mechanical system expansion, and similar
special requirements.
Program Guide PG-18-15, Volume E
May 2006