III.
REQUEST FOR PROPOSAL DOCUMENT SUBMISSION
GENERAL: The RFP Documents shall include and address the following:
1. Technical Requirements as indicated in Section II, REQUIREMENTS FOR
LEVEL 1 AND LEVEL 2 RFP DOCUMENT SUBMISSION; and
2. Project Objectives, Selection Procedure, Offer Requirements, and General
Contract Requirements as indicated in the front-end Specification Section
REQUEST FOR PROPOSAL TO DESIGN-BUILD (Attachment to be
completed) which provides a summary of the review and selection process
of the Design-Build (DB) Team.
Program Guide PG-18-15, Volume E
May 2006
23