disciplines. Clearly state the revised capacities of the existing systems affected by
the demolition work together with additional efforts, if any, involved in testing,
balancing, and adjusting them.
k. Submit HVAC specifications in format provided in CD1, paragraph 16,
SPECIFICATIONS.
10. INCINERATION
a. Submit 100 percent complete and coordinated drawings and calculations.
b. Submit verification that a check for changes in applicable emissions
regulations which may affect the design or operation of the incineration system has
been performed and any changes have been used in the final design.
c. Submit incinerator specification in format provided in CD1, paragraph 16,
SPECIFICATIONS.
11. INTERIOR DESIGN
a. Illustrate and document 100 percent complete design solution.
b. Submit Specification Section 09050 and the finish schedule 100 percent
completed. Include all applicable notes and comments.
c. Submit one set of 100 percent complete sample boards. Once the first set is
approved, submit two additional identical approved sets.
d. Submit 100 percent complete keyed finish plans and labeled interior design
details, elevations, and sections as required.
e. Ensure the complete coordination among Specification Section 09050, finish
schedule, sample boards, and drawings.
12. PLUMBING
a. Submit 100 percent complete and coordinated drawings to include the
following:
1) Previously submitted drawings that have incorporated comments of the
last review;
2) All piping sized;
3) Demolition plumbing floor plans at 1:100 (1/8-inch) scale;
4) Riser diagrams; and
5) Legend, notes and details.
Program Guide, PG-18-15, Volume B
Construction Documents 1
May 2006
Page 49