6.
ESTIMATING
Submit a construction cost estimate in compliance with the Manual for
Preparation of Estimates. Incorporate review comments from the previous review.
Include at least the following:
a. Detailed estimate take-off worksheets;
b. Level "B" Summary Sheets: For all buildings and sitework;
c. Supplement A to SF 252: For gross building area take-off of all occupiable
buildings;
d. Project Data Sheets 1 and 2; and
e. Detailed Market analysis.
7. EQUIPMENT
Submit equipment specifications in format provided in CD1, paragraph 16,
SPECIFICATIONS.
8. FIRE PROTECTION
a. Submit 100 percent complete fire protection drawings, including the
following:
1) Details of the fire pump system, including elevation and isometric detail
of fire pump;
2) Details of the stairwell sign indicating stairwell number, floor number, and
upper and lower floor terminus of stairwell;
3) Door and window schedule indicating fire rating and whether fire rated
glazing will be provided;
4) Interconnection of elevator controls with fire alarm system;
5) Interconnection of kitchen fire extinguishing and fire pump system to the
fire alarm system;
6) Zoning of each fire alarm initiating device;
7) Single line riser diagram for the fire alarm system;
8) Detail of annunciator panel;
Program Guide, PG-18-15, Volume B
Construction Documents 1
Page 46
May 2006