May 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
Design Development 2 (DD2)
ARCHITECTURAL REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
1
Compliance with A/E Submission Instructions (PG-18-15)
2
Incorporate all of the revisions required from DD1 Review
3
Floor Plans/Drawings;
a. All floors (new and renovated)
b. Penthouse
c. Roof plan (mechanical equipment and architectural screens)
d. Pipe basement (emergency exit, ventilation, and stairs)
e. Pipe tunnel
f. Ceiling plan
(1) Ceiling mounted equipment
(2) Lighting fixtures
(3) Air diffusers
(4) Registers
(5) Tracks
(6) Room names and numbers
g. Fire Protection plan add:
(1) main fire alarm panel
(2) fire extinguisher cabinets
(3) Areas not protected by automatic sprinklers
h. Equipment floor plans 1:50 (1/4 inch) scale coordinated with VA
Equipment Guide List (PG 7610)
4
Location of:
a. Rooms with room names and numbers
b. Doors and door swings
c. Corridors with dimensions
d. Column grid lines/grid sizes
e. Expansion and seismic joints
f. Electrical closets
g. Signal and telephone closets
h. Equipment rooms
i. Mechanical shafts and space
9