May 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
Construction Documents (CD1)
ARCHITECTURAL REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
1
Compliance with A/E Submission Instructions (PG-18-15)
2
Incorporate all of the revisions required from DD2 Review
3
Floor Plans/Drawings;
a. Room names and numbers
b. Interior dimensions
c. Exterior dimensions and match lines
d. Column grid lines
e. Expansion joints between new and existing
f. Floor drains and pitch
g. Corner guards, handrails, bumperguards, and grab bars
h. Water coolers (near waiting rooms and along corridors)
i. Air-lock vestibules at main entrance
j. Elevator lobbies (min 12" deep)
k. Ducts and utility shafts that pass through floors
l. Transformer rooms with curbs and no overhead pipes or ducts
m. Roof slope is minimum 1/4" per foot
n. Roof-top equipment with screens
o. Access doors to roof
p. Walkways on roof
r. Door symbols
s. Lead-lines partitions and "universal floor T's"
t. Location and details of Dedication Plaque
u. Floor slab depressions identified and coordinated with structural
drawings
v. Areaways with rails or gratings
4
Demolition Plans with existing finish schedule and notes
5
Reflected Ceiling Plan
6
Equipment Plans with elevations and details
12