May 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
SCHEMATIC 2
ARCHITECTURAL REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
8
Layout of critical areas (1:50 - 1/4 in.) showing:
a. Minimum clearances around patient beds
b. Correct bed sizes
c. Dimensions of patient wardrobes in mental health units
d. Accessible toilet and bedrooms
9
Exterior building elevations:
a. Significant materials including colors
b. Massing
c. Fenestrations
d. Relationship to adjacent structures
e. Finish grades
f. Floor-to-floor heights
g. Floor elevations
h. Exterior materials
i. Canopies at entrances and loading docks (minimum clearances)
10
Building section
11
Coordinate all drawings with other technical disciplines
12
Compliance with VA NCS Application Guide and applicable NCS
modules.
6