May 2006
p. Fire and smoke rated partitions
q. Fire extinguisher cabinets
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
Design Development 1 (DD1)
ARCHITECTURAL REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
5
Wall thickness and chase walls
6
Handrail locations and dimensions (where required)
7
Program net area/designated net area
8
Exterior building elevations:
a. Significant materials including colors
b. Massing
c. Fenestrations
d. Relationship to adjacent structures
e. Finish grades
f. Floor-to-floor heights
g. Floor elevations
h. Canopies at entrances and loading docks (minimum clearances)
i. Future expansion
9
Building sections (same scale as floor plans):
a. Finish floor elevations
b. Relationship of finish ground floor to finish grade at major
entrances
c. Floor elevation alignment if building abuts existing structure
10
Wall sections showing construction, building materials and systems,
and proposed sill and head heights of openings
11
Finish schedule
12
Specification Section 09050 for materials and products for interior
design
13
Coordinate all drawings with other technical disciplines
14
Compliance with VA NCS Application Guide and applicable NCS
modules.
8