May 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
Design Development 1 (DD1)
ARCHITECTURAL REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
1
Compliance with A/E Submission Instructions (PG-18-15)
2
Incorporate all of the revisions required from S2 Review
3
Floor Plans/Drawings;
a. All floors (new and renovated)
b. Penthouse
c. Roof plan (mechanical equipment and architectural screens)
d. Pipe basement (emergency exit, ventilation, and stairs)
e. Pipe tunnel
f. Equipment floor plans 1:50 (1/4 inch) scale
g. Fire Protection plan
(1) Room names and numbers
(2) Door locations and swings
(3) Smoke and fire rated partitions
4
Location of:
a. Rooms with room names and numbers
b. Doors and door swings
c. Corridors
d. Basic column/grid sizes
e. Expansion and seismic joints
f. Electrical closets
g. Signal and telephone closets
h. Equipment rooms
i. Mechanical shafts and space
j. Plumbing fixtures
k. Stairs
l. Ramps
n. Automatic conveyances
o. Trash and linen chutes
7