May 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
SCHEMATIC 1
ARCHITECTURAL REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
1
Compliance with A/E Submission Instructions (PG-18-15)
2
Architectural narrative - Explain alternative designs and their proposed
exterior materials
3
Schematic block plans showing:
a. All floors (new and renovated)
b. Penthouse
c. Roof plan
d. Pipe basement
e. Key plan, title block, north arrow, and scale on each floor plan
f. Temporary index of drawings
Exterior dimensions/total building gross area:
a. Circulation
b. Mechanical areas
c. Electrical Areas
d. Exterior walls
Size and shape of all departmental functions and services:
a. Label each service or activity
c. Show activity code number
4
Location of:
a. Entrances to buildings
b. Main entry point to each functional block
c. Mechanical spaces
d. Expansion joints
e. Structural grid
f. Special seismic structural features
5
Finish floor elevations
6
Finish grades at corners, entrances, exits, platforms, and ramps
7
Schematic section of building
8
Lead abatement
9
Compliance with VA NCS Application Guide and applicable NCS
modules.
4