May 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
SCHEMATIC 2
ARCHITECTURAL REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
1
Compliance with A/E Submission Instructions (PG-18-15)
2
Narrative for building construction, fire and smoke separation, fire
sprinkler/standpipe systems, pump sizes, water supply
available/maximum demand, water flow testing results, fire alarm
systems, and kitchen extinguishing systems.
3
Floor Plans/Drawings;
a. All floors (new and renovated)
b. Penthouse
c. Roof plan
d. Pipe basement
4
Location of:
a. Rooms with room names and numbers
b. Doors
c. Corridors
d. Basic column/grid sizes
e. Expansion and seismic joints
f. Electrical closets
g. Equipment rooms
h. Signal and telephone closets
i. Mechanical shafts and space
j. Stairs
k. Ramps
m. Automatic conveyances
n. Trash and linen chutes
o. Fire and smoke rated partitions
5
Program net area/designated net area
6
Exterior dimensions/total building gross area
7
Each integral or fragmented service outlined with name and code
5