May 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
Design Development 2 (DD2)
ARCHITECTURAL REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
9
Building sections (same scale as floor plans):
a. Finish floor elevations
b. Relationship of finish ground floor to finish grade at major
entrances
c. Floor elevation alignment if building abuts existing structure
d. Floor-to-floor heights
e. Pipe basements and roof mechanical equipment
d. Section through elevator shaft
e. Section through stairways
10
Wall sections showing construction, building materials and systems,
and proposed sill and head heights of openings
11
Finish schedule with Specification Section 09050 edited and complete
12
Specification Section 09050 for materials and products for interior
design
13
Sample specifications sections edited in pencil
14
Equipment Activation List
15
Coordinate all drawings with other technical disciplines
16
Compliance with VA NCS Application Guide and applicable NCS
modules.
11