d. Provide manhole, or concrete trench and tunnel drawings, showing the basic
piping layout and pipe supports in plans and sections.
e. Provide list of all standard and special details to be furnished later. See
DD2, paragraph 16, SPECIFICATIONS, for specification requirements.
18. STEAM GENERATION
a. Update all steam load calculations. Revise equipment and piping
calculations as necessary. Calculate the performance requirements for all control
and regulating valves, flowmeter systems, steam traps, heating and ventilating
systems. Provide stress calculations on steam piping systems. Submit all
calculations.
b. Show the locations of all equipment, major piping, and pipe supports in plans
and sections. Show demolition work. Draw plans and sections at 1:50 (1/4 inch)
scale.
c. Provide completed schedules, equipment lists, and plot plans. List all
standard and special details to be furnished later. Complete all schematic flow
diagrams.
d. See DD2, paragraph 16, SPECIFICATIONS, for specification requirements.
19. STRUCTURAL
a. Submit 1:100 (1/8 inch) scale plans, sections and details, showing tentative
sizes of columns, beams, lateral load resisting elements, load bearing walls, slabs,
and foundations in major areas. Complete structural drawings enough to correlate
with architectural and mechanical features. Show sections and details so that
construction features can be defined, including the interface of new with existing
construction.
b. Submit calculations developed to date, including vertical and lateral load
design.
c. If not previously submitted, submit two copies of completed subsurface
investigation report.
d. See DD2, paragraph 16, SPECIFICATIONS, for specification requirements.
Program Guide, PG-18-15, Volume B
Design Development 2
Page 42
May 2006