12. PLUMBING
a. Submit current design narrative.
b. Submit 1:00 (1/8 inch) floor plans indicating plumbing requirements of
previous review. Add plumbing piping. Pipe sizes are not required. Locate and
size new equipment. Provide schedule for equipment on drawings.
c. Provide equipment calculations.
d. Provide list of specifications that will be required.
13. SANITARY
a. Submit current design narrative.
b. Submit contract utility drawings at the same scale as required for SITE
DEVELOPMENT AND ENVIRONMENTAL drawings. Utilities include water
(domestic and fire), fuel gas, gasoline, fuel oil, storm drainage and sanitary sewage
systems:
1) Size water, fuel gas and fuel oil piping;
2) Locate and size pumps, storage facilities, and treatment equipment; and
3) Indicate areas/zones of irrigation systems. Describe system design
(automatic, manual, quick coupler, master, satellite or both controls, etc.).
c. Submit calculations.
d. Provide list of specifications that will be required.
14. SITE DEVELOPMENT
a. Complete grading plans of the entire project including large scale drawings
of major site elements. Include spot elevations at structure corners, entrances,
other critical areas, and all first floor elevations. Show rim and invert elevations on
all storm drainage fixtures. Show demolition, erosion and sediment control. If rock
excavation is required for site grading, indicate quantity on grading plans.
b. Provide vertical profile and horizontal alignment for roads. Indicate all
traversed utilities.
c. Provide large scale plans, where necessary, of concrete or other paving joint
patterns.
d. Submit layout plan, substantially complete, showing locations of buildings,
inlets, equipment at grade, and landscape features. Include dimensioning of
Program Guide, PG-18-15, Volume B
Design Development 2
Page 40
May 2006