m. See DD2, paragraph 16, SPECIFICATIONS, for specification requirements.
10. INCINERATION
a. Update all load calculations. Revise equipment and systems calculations as
necessary. Submit all calculations.
b. Show the locations of all equipment and major piping in plans and sections.
Show demolition work. Provide 1:50 (1/4 inch) scale plans and sections.
c. Provide completed schedules, equipment lists, and plot plans. List all
standards and special details.
d. See DD2, paragraph 16, SPECIFICATIONS, for specification requirements.
11. INTERIOR DESIGN
a. Illustrate refinements, revisions, and recommendations from the DD1 review
and VAMC presentation.
b. Illustrate and document a 100% complete design solution for all interior
spaces. Use elevations, perspectives, plans, and details as required.
c. Show the relationships among, and transitions of one to another, for all
departments, functions, patterns, and signage.
d. Show development of all design details.
e. Show a 100% edited and complete Specification Section 09050 and finish
schedule. Include colors and materials on the exterior of the building.
f. Submit sample boards for all interior and exterior materials, products, and
finishes having color, texture, pattern, etc. Samples must be the actual material
and/or product.
g. Provide the edited carpet and wallcovering specifications. Add the
specification numbers for both.
h. Submit a written report on A/E's interior design presentation to the VAMC or
the Veterans Benefit Administration.
i.
See DD2, paragraph 16, SPECIFICATIONS, for specification requirements.
Program Guide, PG-18-15, Volume B
Design Development 2
May 2006
Page 39