f. Indicate changes required on the architectural drawings where existing
transport systems are retained and modified to serve new or existing areas.
g. Provide all electrical criteria (per VA Basic Electrical Notes and Automatic
Transport Design Manual) on electrical drawings.
h. See DD2, paragraph 16, SPECIFICATIONS, for specification requirements.
4. CRITICAL PATH METHOD (CPM)
If required, submit the following including VA comments from previous phasing
meetings and DD1 review:
a. Phasing Narrative;
b. Phasing Diagram drawn on the Phasing Plan;
c. Full size contract drawings for the CPM Phasing Plans (one drawing may
reflect several reduced site plans);
d. Written list of systems, including temporary system by phase, and separated
by technical discipline; and
f.
See DD2, paragraph 16, SPECIFICATIONS, for specification requirements.
5. ELECTRICAL
a. Provide drawing list of symbols and abbreviations.
b. Submit detailed electrical plot plan.
c. Submit finalized one-line and riser diagrams of the normal electrical power
distribution system and the emergency power system. Locate, size, and identify
equipment. Show typical branch circuit wiring of offices, exam rooms, bedrooms
and lab areas.
d. Submit a full set of floor plans. Show locations of primary distribution
switchgear, engine generator sets, unit substations, feeder routing plan and other
major items of equipment.
e. Indicate room titles and area functions on electrical floor plans. Show
location of all equipment, lighting fixtures, outlets for power, fire alarm devices, and
signal outlets and devices. Substantially laid out specialty areas (radiology,
office/exam, bed areas, O.R.'s, ICU's, etc.).
f. Show smoke partitions and fire alarm zones on all electrical floor plans.
Submit fire alarm and signal (nurse call, telephone, MATV, CCTV, radio, P.A., etc.)
riser diagrams.
Program Guide, PG-18-15, Volume B
Design Development 2
May 2006
Page 35