sizing, voltage drop, short-circuit, and the engine-generator sizing calculations, if
i.
Establish a proposed Phasing scheme of electrical work.
j. Provide copies of all correspondence and minutes of meetings with the utility
company's representatives.
k. See DD2, paragraph 16, SPECIFICATIONS, for specification requirements.
6. ESTIMATING
Submit a construction cost estimate in compliance with the Manual for
Preparation of Estimates. Include at least the following:
a. Detailed estimate take-off worksheets;
b. Level "B" Summary Sheets: For each buildings and sitework in detail.
Separate estimates for new construction and alteration work;
c. Building gross area computations for new construction and alteration work;
d. Project Data Sheets 1 and 2, including market survey;
e. Asbestos abatement cost estimate; and
f.
Local Market Survey.
7. EQUIPMENT
a. Submit updated Activation Equipment List.
b. See DD2, paragraph 16, SPECIFICATIONS, for specification requirements.
8. FIRE PROTECTION
a. Add the following to fire protection drawings:
1) Sprinkler/Standpipe risers supply piping;
2) Termination's of sprinkler main and inspector test drains;
3) Sprinkler alarm valve(s) and waterflow and tamper switches;
4) Sprinkler system fire department connections;
5) Sprinkler design hazards per NFPA 13;