c. Calculate the size of all major piping systems. Base calculations on pipe
sizing and pump selections on actual arrangement of the piping systems. Refine
calculations. Submit catalog cuts of two manufacturers on all equipment selections.
d. Provide plan views and sections of the steam plant showing major
equipment, major piping systems, and personnel facilities. Also provide schematic
flow diagrams of all piping systems.
e. Refine steam load and equipment sizing calculations and submit all
calculations.
19. STRUCTURAL
a. Submit 1:100 (1/8 inch) scale drawings showing the selected structural
system for typical bays. Show beam depths, slab thickness, column sizes, load
bearing walls, lateral load resisting element, foundation sizes, and expansion joints.
b. Show typical details correlating architectural and mechanical features and
correlating new and existing construction features.
c. Submit supporting calculations.
d. Submit two copies of completed subsurface investigation report.