M. SOLID WASTE DISPOSAL SYSTEM INCLUDING INCINERATION:
Submit the following:
Solid Waste Disposal System Including
Schematics*
DD**
CD***
Incineration:
Incineration report including:
1. amount and type of waste (new &
existing)
2. emissions regulations and types
of emissions controls required
3. life-cycle cost analysis on
alternatives for waste disposal
4. calculations of equipment sizing
and description of types of
equipment
5. viable alternatives for waste
disposal
Evaluation of capability of existing
incinerator
Complete description of existing
processing system
Tests to determine remaining service
life and capacity of system
Plot plan with new plant location and
location of existing plant
Plan view layout of new system or
existing system showing new
equipment location
Load calculations on amount and types
of waste
Plot plan with location of new
processing system
Plans/sections showing locations of:
Equipment
Major piping
Demolition
Catalog cuts (2 min.) of equipment
selections
Emissions control devices
Schedules
Equipment lists
List of standards to be furnished later
List of special details to be furnished
later
Program Guide, PG-18-15, Volume C
33
May 2006