Automatic Transport:
Schematics*
DD*
CD*
Details
Carlifts
Trash chutes
Linen chutes
ETVS
Elevator machine room equipment
layout
Interface with automatic recall and
shutdown (see fire protection)
Specifications
*
Submit, as a minimum, a single line layout for at a scale not less than
1:100 (1/8 inch). Submit a complete double line layout of areas of critical
importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated,
incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch)
scale floor plans, incorporating all revisions required by comments from the
design development phase.
N. NOTES:
1. Include tracking, piping, battery charging areas, blower rooms, queuing
areas, cart holding areas, cart washer, central control area, and floor or wall
recessed transport control units. Indicate architectural features in areas to be
utilized for these systems. Indicate on architectural drawings all the major
equipment located in machine rooms, secondary levels, pits, and the areas
pertaining to ATS, AGVS and ETVS.
2. Indicate changes required on the architectural drawings where existing
transport systems are retained and modified to serve new and existing areas.
3. Provide all electrical criteria (per basic electrical notes and Automatic
Transport Design Manual) on electrical drawings.
Program Guide, PG-18-15, Volume C
36
May 2006