Home
Download PDF
Order CD-ROM
Order in Print
Home
>
VA Criteria Documents and other related files
>
> VA Medical Center Projects A/E Submission Instructions for Minor and NRM
VA Medical Center Projects A/E Submission Instructions for Minor and NRM Construction Program
Foreword - aesubmin0002
Table-of-Contents - aesubmin0003
Table-of-Contents-cont. - aesubmin0004
Introduction - aesubmin0005
A/E Responsibilities - aesubmin0006
Submission Policy - aesubmin0007
Critical Path Method Phasing Meetings - aesubmin0008
Site Development - aesubmin0009
Site Development-cont. - aesubmin0010
Architectural - aesubmin0011
Notes - aesubmin0012
Notes-cont. - aesubmin0013
Notes-cont. - aesubmin0014
Fire Protection - aesubmin0015
Fire Protection-cont. - aesubmin0016
Fire Protection-cont. - aesubmin0017
Notes - aesubmin0018
Interior Design - aesubmin0019
Notes-cont. - aesubmin0020
Structural - aesubmin0021
Notes - aesubmin0022
Plumbing - aesubmin0023
Plumbing-cont.
Sanitary - aesubmin0025
Sanitary-cont.
HVAC - aesubmin0027
HVAC-cont.
Notes - aesubmin0029
Notes-cont. - aesubmin0030
Electrical - aesubmin0031
Electrical-cont.
Equipment - aesubmin0033
Steam Generation - aesubmin0034
Notes - aesubmin0035
Steam Distribution (Outside) - aesubmin0036
Solid Waste Disposal System Including Incineration
Solid Waste Disposal System Including Incineration-cont.
Automatic Transport - aesubmin0039
Notes - aesubmin0040
Asbestos Abatement:
Notes - aesubmin0042
Critical Path Method (CPM) - aesubmin0043
Estimating - aesubmin0044
Specifications
Final Bid Documents - aesubmin0046
Distribution of A/E Materiel
Distribution of A/E Material - aesubmin0048
VA Medical Center Projects A/E Submission Instructions for Minor and NRM Construction Program