I. NOTES:
1. Include basic assumptions, points of interconnection, impact of new
construction to existing electrical distribution system, current demand loading
(high voltage switchgear and primary feeder), and projected load of new
construction. Propose various feasible electrical systems for project and provide
advantages/disadvantages.
2. Include means and clearances for installation, maintenance, and
removal/replacement of equipment.
3.
Electrical, signal and telephone closets must stack vertically.
4. Include high voltage and low voltage switchgear, transformers and low
voltage main and/or distribution panels, branch panels and methods of feeding
277/480 volt and 120/208 volt normal and emergency panels.
J. EQUIPMENT: Submit the following:
Equipment:
Schematics*
DD**
CD***
Equipment (on architectural drawing)
Activation Equipment List (Excel
format)
Specifications
*
Submit, as a minimum, a single line layout for at a scale not less than
1:100 (1/8 inch). Submit a complete double line layout of areas of critical
importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated,
incorporating all of the revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch)
scale floor plans, incorporating all revisions required by comments from the
design development phase.
Program Guide, PG-18-15, Volume C
29
May 2006