and 703). Draw equipment details that are necessary for major decisions, though
complete detailing is not required for this submittal.
g. Show all major wall sections in outline form.
h. Provide draft contract documents for each required millwork item.
i. Submit construction details for major building components and systems,
such as window design, roofing system, special entryways, building "skin",
architectural construction requirements for the project. Complete detailing of
miscellaneous items is not required for this submission.
j. Show drafting symbols and abbreviations per VA Standards, general notes,
and begin drawings for door, window and louver schedules.
k. If applicable, submit demolition plans, existing finish schedule and notes on
demolition plan.
l. Submit fire protection plans with revisions require from comments on
previous submittal.
m. Submit an architectural narrative.
n. Submit revised three-dimensional sketch(es) and study model(s).
3. INTERIOR DESIGN
a. Finishes:
(1) Provide completed finish schedule on the architectural drawings.
(2) Provide an 80% complete section 09050 specification. The
specification shall include manufacturer's names, numbers and patterns.
(3) Submit finishes sample boards, which will not be returned. Keep a
duplicate set of boards.
b. Furniture and Furnishings Package: The VA Project Manager must confirm
the inclusion of furniture and furnishings in the project prior to proceeding. The A/E
shall select all furnishings from the Federal Supply Schedule (FSS). If required,
provide the following.
(1) Provide furnishings plans, include separate plans with codes for
furniture, window treatments, accessories, art and plants. Submit cut sheets of all
furniture, accessories, art, and planters. Submit samples of all fabrics and
Program Guide, PG-18-15, Volume D
June 1999
Page 29