a. The A/E shall submit a construction cost estimate in compliance with the
Manual for Preparation of Estimates. The estimate should incorporate all of the
review comments from the previous review. This estimate should include but not be
limited to:
(1) Level "B" Summary Sheets: For all buildings and sitework.
(2) Supplement A to SF 252: For gross building area take-off of all
occupied buildings.
(3) Project Data Sheets 1 and 2.
12. CRITICAL PATH METHOD (CPM)
a. If required, submit the following including VA comments from previous
phasing meetings and Schematics 2 review:
(1) Phasing Narrative.
(2) Phasing Plans (on reduced site plans).
(3) Phasing Diagram.
(4) Phases marked on all full size drawings submitted for VA review.
(5) Written list of systems, including temporary system by phase, and
separated by technical discipline.
B. DESIGN DEVELOPMENT 2 [DD 2]
1. SITE DEVELOPMENT AND ENVIRONMENTAL
a. Complete grading plans of the entire project including large scale drawings
of major site elements. Include spot elevations at structure corners, entrances, other
critical areas, and all first floor elevations. Show rim and invert elevations on all
storm drainage fixtures. Show demolition, erosion and sediment control.
b. Show vertical profile and horizontal alignment for roads. Indicate all
traversed utilities.
c. Provide large-scale plans, where necessary, of concrete or other paving
joint patterns.
d. Layout plan, substantially complete, showing locations of buildings,
landscape features, inlets, and equipment at grade. Include dimensioning of
parking lots, service courts and other major elements of the site design. Indicate