11. CRITICAL PATH METHOD (CPM)
a. If required, submit the following including VA comments from previous
phasing meetings and Design Development 1 review:
(1) Phasing Narrative.
(2) Phasing Diagram drawn on the Phasing Plan.
(3) Full size contract drawings for the CPM Phasing Plans (one drawing
may reflect several reduced site plans)
(4) Written list of systems, including temporary system by phase, and
separated by technical discipline.