11. CRITICAL PATH METHOD (CPM)
a. If required, submit the following including VA comments from previous
phasing meetings and Schematics 1 review:
(1) Phasing Narrative.
(2) Phasing Plans (on reduced site plans).
(3) Phasing Diagram.
(4) Phases marked on all full size drawings submitted for VA review.
(5) Written list of systems, including temporary system by phase, and
separated by technical discipline.
Program Guide, PG-18-15, Volume D
June 1999
Page 22