b. Submit plans indicating existing and proposed utilities listed above. Provide
approximate size of proposed utilities. Locate roughly where treatment facilities (if
required) will be located and areas of lawn irrigation.
c. Show rough limits of irrigation.
6. PLUMBING
a. If renovation is involved, describe the existing facilities and make
recommendations to replace or reuse fixtures and equipment.
b. There are no submittal requirements for new construction at this stage.
7. HEATING, VENTILATING & AIR CONDITIONING
Investigate the availability of utilities (natural or propane gas, electricity, steam,
or hot water) for the HVAC equipment and provide description of their status.
8. ELECTRICAL
a. Determine presence of any existing service and related major equipment,
and ascertain its capacity to supply the new load. Show on an electrical site plan
the location of major existing and proposed service equipment including power
b. Where buildings are involved, show location of electrical equipment rooms
and closets on the floor plan.
9. COST ESTIMATING
a. The A/E shall submit a construction cost estimate in compliance with the
Manual for Preparation of Estimates. This estimate shall include but not be limited
to:
(1) Level "A" Summary Sheets: For all buildings and sitework.
(2) Supplement A to SF 252: For gross building area take-off of each
occupiable building.
10. CRITICAL PATH METHOD (CPM)
a. If required, submit the following including VA comments from previous