3. INTERIOR DESIGN
a. Finishes: Submit a written narrative of the interior design scheme and
proposed finishes that builds on the previous submission. Provide a sample board
to illustrate the concept.
b. Furnishings: Submit a floor plan indicating furniture placement with specific
type of furniture selections.
4. STRUCTURAL
a. Submit drawings showing selected framing system, with reason for the
selection.
b. Submit supporting calculations.
c. Submit criteria for a subsurface investigation program, along with
qualifications of at least three consultants being considered for the task. Submit the
proposal of the consultant the A/E considers most qualified.
5. SANITARY
a. Provide any revisions to the descriptions and plans of utility systems
indicated in Schematics 1.
b. If wells are required for water source, install test well and obtain water
analysis and expected yield in gallons per minute.
6. PLUMBING
a. Submit design narrative that reflects comments from the Schematics 1
Review.
b. Provide minimum 1:100 (1/8-inch) scale sepias indicating room names and
numbers, locations of existing and new equipment requiring connections to the
plumbing system, and identification of fixtures using VA fixture numbers. Do not use
the designation N.I.C. on the drawings.
7. HEATING, VENTILATING & AIR CONDITIONING
Provide a description of the heating, ventilating and air conditioning (HVAC)
systems and equipment in accordance with latest ASHRAE Standards and VA
criteria.
Program Guide, PG-18-15, Volume D
June 1999
Page 20