Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 286
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service - Surgical
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAIN
CEILING
DOOR
H.W.NO.
SYMBOL
15 V-V2 15
GWB
104
Special OR
WSF
WSF
GWB
(SC)1
109
(Orthopedic,
QQ-V
Vascular)
15 V-V2 15
GWB
Cardiac/
WSF
WSF
GWB
104
(SC)1,3
Neurosurgery OR
109
QQ-V
Operating Room Support:3
1/2 VV-T5
Clean Core (Staff
WSF
WSF
GWB
GWB
12
Workroom)
(SC)
WSF
WSF
GWB
GWB
1/2 S-T or
Scrub-up Area
108
(Aseptic OR)3
(SC)
15 S-V and
Open
Sub-sterile Room
WSF
WSF
GWB
GWB
15 S-V
12
(Cabinet-enclosed
(SC)
Equipment)3
Sub-sterile Room
WSF
WSF
GWB
GWB
15 S-V
12
(SC)
Equipment)3
Radiographic Film
WSF
WSF
GWB
GWB
1/2 S or
69 or
Processing Room
(SC)
1/2 S-M
14
Frozen Section
WSF
WSF
GWB
GWB
1/2 S
67
Laboratory
(SC)
Receiving Room/
WSF
WSF
GWB
GWB
Open
Dispatch Room (Cart
(SC)
Lifts To/From SPD)
Equipment and
WSF
WSF
GWB
GWB
1/2 V-T
69
Apparatus Storage
(SC)
Clean and Sterile
WSF
WSF
GWB
GWB
11/12 V-T
42
Supplies Storage
(SC)
Soiled Holding/
WSF
WSF
GWB
GWB
11/12 V-W
42
Disposal Room
(SC)
1
See Architectural Design Manual PG-18-10, paragraph 4.3.3.2, for lead lining".
2
Doors from clean core into operating rooms.
3
See Architectural Deign Manual PG-18-10, Chapter 5, for electromagnetic shielding.
4
Doors from support spaces into operating rooms may need to be lead lined.
5
See Section II, "Doors and Hardware".
126