Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 286
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service - Surgical
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAIN
CEILING
DOOR
H.W.NO.
SYMBOL
NOTES:
(a) Rooms or Spaces are based on Space Criteria and the Surgical Design
Guide.
(b) Doors from corridor to operating rooms to be a minimum of 4'-0". Doors
from clean core to operating rooms to be a minimum of 3'-8". All other
doors into operating rooms 3'-0".
Administrative/Staff Offices:
Office, Chief,
CP
RB
GWB-W
AT
1/2 S
52
Surgical Service
Office, Chief,
CP
RB
GWB-W
AT
1/2 S-T
23
Anesthesiology
Office, Head of
CP
RB
GWB-W
AT
1/2 S
52
Surgical Section
Office, Asst. Chief,
CP
RB
GWB-W
AT
1/2 S
23
Surgery
Office, Asst. Chief,
CP
RB
GWB-W
AT
1/2 S-T
23
Anesthesiology
Office,
CP
RB
GWB-W
AT
1/2 S-T/
23
Secretary/Waiting
Open
Clerical
CP
RB
GWB-W
AT
1/2 S-T
23
Office, Staff
CP
RB
GWB-W
AT
1/2 S
52
Surgeon,
Anesthesiologist,
Resident, and Nurse
Anesthetist
Office, Surgical/
CP
RB
GWB-W
AT
1/2 S
23
Anesthesiology
Residents
Office, Operating
CP
RB
GWB-W
AT
1/2 S
23
Room Coordinator
See Chapter 274
Operating Rooms (OR) (Aseptic):
1/2 V-T2
General OR
12
WSF
WSF
GWB
GWB
(Ambulatory, Eye,
79
(SC)
1/2 QQ-T
ENT, etc.)1
1
Use lead lined doors if room contains fixed x-ray units.
2
Doors from clean core into operating rooms.
125