Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 285
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service Supply Processing and Distribution
ROOM OR SPACE
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAIN
CEILING
DOOR
H.W.NO.
SYMBOL
Soiled Receiving
QT
QT
GWB
GWB (SC)
2 UU-T/ 12
82
and Decontamination
(SC)
UU-W
161
Area
CT1
Manual Equipment
QT
QT
PCP
2 W-T or
69
Area
as req'd
CT1
Automatic Cart Wash
QT
QT
PCP
2 W-T or
4
as req'd
Housekeeping Aides
QT
QT
CT
GWB (SC)
1/2 T
13
Closet
Lockers, Lounge,
See Chapter 410
Toilet, and Shower
Facilities
Clean Side:
QT2
Prep. Assembly and
QT
GWB
AT (SP)
2 UU-T/ 12
82
Sterilization
(SC)
UU-W
161
ETO Gas Cylinder
QT
QT
GWB
GWB (SC)
12 W
43
Storage
(SC)
Sterile/Non-Sterile Storage Area:
Sterile Areas
VCT
RB
GWB
AT (SP)
12 UU-W
161
(SC)
Non-Sterile Areas
VCT
RB
GWB
AT (SP)
12 UU-W
161
(SC)
Bulk Storage Area
VCT
RB
GWB
AT (SP)
12 UU-W
161
(SC)
Sterilizer
C
Prefab Panel
PCP
Prefab
Mechanical
Clean Receiving and
VCT
RB
GWB
AT (SP)
2 UU-T/ 12
82
Breakout Room
(SC)
UU-W
161
Dispatch Area:
Control
VCT
RB
GWB
AT
1/2 S-T/
23
Station/Office
(SC)
11/12 S-W
45
Work Station
VCT
RB
GWB
AT
1/2 S-T
52
1
Mount CT on concrete backer board.
2
Extend QT 10' beyond sterilizers.
123