SPG 3
SITE SURVEYS, SUBSURFACE AND OTHER INVESTIGATIONS
The A/E shall arrange for and oversee the performance of topographic surveys, test borings,
test pits, soil tests, subsurface exploration and other such investigations as he determines are
required for the proper design of the project. Before such surveys and investigations are
undertaken, the A/E shall secure the written approval of the Contracting Officer. After
receiving the Contracting Officer's approval the A/E shall follow either CP 1 or CP 5.
Expenditures for this work shall not exceed the authorized amount without prior written
approval of the Contracting Officer. As soon as available, the A/E shall submit to the
Contracting Officer the original drawings of topographic surveys and/or results of subsurface
or other investigations. The Government shall reimburse the A/E for cost of such surveys
and/or investigations.
(1) upon presentation by the A/E of an invoice therefor accompanied by
executed receipts, and,
(2) after receipt and acceptance by the Contracting Officer of the pertinent data,
drawings and recommendations.
3