Whenever the masculine gender is used in the contract, it shall be considered to include both
masculine and feminine gender.
SPI 5
COORDINATION WITH STATION
Before starting any work on the VA station, the A/E shall consult with the Station Director and
secure his permission to start the work. The A/E shall perform the work within the parameters
established by the Station Director. He shall not interfere with the normal functioning of the
station.
SPI 6
RELEASE OF INFORMATION
The A/E shall not divulge or release any information, oral or written, developed or obtained in
connection with performance of this contract or any possible construction based on the results
thereof (including, but not limited to, reports, plans, specifications, location, time, estimated
cost of construction or estimated VE savings) or except to authorized Government personnel or
upon prior written approval of the Contracting Officer.