P. SPACE PLANNING
Schematics
DD
CD
Space-Accounting Summary Table
1
2
3
P. NOTES:
1. Provide a tabular table with columns entitled Departmental Function, H-7610
Requirements, Approved Space Program [Net Square Meters (Net Square
Feet)], Variance Between H-7610 and Approved Space Program, Departmental
Conversion Factor, Planned Departmental Gross Square Meters (Feet); column
totals; and a Total Project Net to Gross Factor. Also, list separately the area
required for additions to the program, unassigned space, major circulation (inter-
departmental corridors, stairs, elevators), major mechanical and electrical
spaces, exterior walls, connecting corridors to other buildings, space for future
mechanical system expansion, and similar special requirements.
2. Update table. Justify in writing substantial deviations from the approved
space program.
3.
Update table.
Q. CRITICAL PATH METHOD (CPM): Submit the following:
Critical Path Method (CPM)j:
Schematics
DD
CD
Phasing Narrative
Phasing Plans (on reduced site plans)
Phasing Diagram
Phases (marked on full size drawing)
Written list of systems1
Phasing Diagram (drawn on Phasing
Plan)1
CPM Phasing Plans (full size contract
drawings)2
O. NOTES:
1.
Include temporary system by phase, and separate by technical discipline.
2. One drawing may reflect several reduced site plans.
Program Guide, PG-18-15, Volume C