C. SCHEMATICS 2 [S2]
GENERAL
1. ARCHITECTURAL
a. Using the approved architectural concept from S1, submit, as a minimum, a
single line layout for all floors, penthouses, and roof areas with double line exterior
walls at a scale not less -than 1:200 (1/16 inch). 1:100 (1/8 inch) is better, if it will
allow an entire floor to be shown on one sheet. Incorporate all revisions from
comments on the previous submittal and show all rooms, doors, corridors, basic
column grid, assumed column sizes, expansion and seismic joint locations,
electrical closets and equipment rooms, signal and telephone closets, mechanical
automatic conveyances. Doors may be indicated with a slash mark. In schematics,
use lines between spaces to indicate the centerline of the partition. Along the
corridor, the line shall represent the corridor side of the partition.
b. Identify each room or space with its name and the program net area over the
designed net area. Names on drawings shall be the same as those used in the
space program. Provide area figures in fractional form, e.g., 400/390. Indicate
space provided, but not called for in the space program, as: -/390.
c. When the project includes more than one department or service, outline and
label each service with its name and code. When a service is fragmented or
scattered in various locations, similarly outline and identify (use code number alone
where space is limited) each piece.
d. Show the overall exterior dimensions for determining the total building gross
area.
e. Indicate planned future expansion, both vertical and horizontal.
f. Submit a complete double line layout of nursing units, and any other areas of
critical importance, at a scale of 1:50 (1/4 inch) including equipment.
g. Submit preliminary elevations of all facades showing massing, proposed
fenestration and the building relationship to adjacent structures and the finish grade.
Show all significant building materials, any proposed roof top mechanical
equipment, and architectural screens on the elevation drawings. If applicable,
indicate future expansion (vertical and horizontal).
h. Provide a schematic section to define building configuration.
Program Guide, PG-18-15, Volume B
Schematics 2
Page 14
May 2006