June 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
CONSTRUCTION DOCUMENTS 1 (CD1)
REVIEW
COMMENTS/
NO.
ITEM
YES/NO/NA
1
Check whether the A/E submission is in compliance with PG-18-15.
2
Summary of PG-18-15, A/E submission requirements for the designers:
a. Provide complete and final calculations of all HVAC equipment
and systems.
b. Submit sound analysis of various systems and steps taken to
ensure compliance with the noise criteria.
c. Complete coordination with other disciplines by providing revised
information developed since the last submission.
d. Submit 100 % complete 1:100 (1/8") scale all HVAC floor plans.
Separate floor plans for ductwork and piping, unless waived by
VA.
e. Submit 100% complete 1:50 (") scale all mechanical equipment
room floor plans with minimum two cross sections at right angles
to each other.
f. Show all roof-mounted equipment on roof plans.
g. Provide 100% complete drawings of the outside chilled and
condenser water distribution with profiles, sections, and details
etc. Show existing utilities through actual inspection at the site and
discussions with the medical center.
h. Provide 100% complete automatic temperature control drawings
including point schedules for all trades, a riser diagram showing
locations of ECC, and field data gathering panels. Show actual
location of ECC and peripherals on floor plans.
i. Provide 100% complete HVAC demolition drawings showing
clearly the extent of demolition work.
j. Submit HVAC original VA Master Specification drafts marked-up
showing the editing for the project. Ensure the specification
sections represent accurate coordination between drawings and
specifications.
14