June 2006
A/E CHECKLIST
TITLE________________________________PROJECT NO. ______________
LOCATION___________________________________DATE ______________
REVIEWED BY ___________________________________________________
ORGANIZATION _________________________________________________
DESIGN DEVELOPMENT 1 (DD1)
COMMENTS/
NO.
ITEM
YES/NO/N/A
2
p. Provide schematics, flow and riser diagrams, control diagrams and
(cont.)
control devices for each type of air handling and hydronic system.
q. Investigate use of existing Engineering Control Center (ECC), if
any.
3
Check compliance by the designer requirements stated in the applicable
VA, HVAC Design Manual.
4
Check smoke and fire protection, and other life safety provisions in the
design:
5
Compliance with VA National CAD Standard Application Guide and
applicable National CAD Standard modules.