Support Facilities
Credit Union
Space is provided by VBA based on requirements determined by the credit
union. The credit union will provide space layout and VBA provides build-out
according to the credit union's specifications.
Employee Lounge
Space is provided for an employee lounge or break area. Size is dependent
on the number of employees at the station. This room should be located away
from the public areas but centrally located for convenience. Equip area for
vending machines, refrigerator, and microwave oven and provide a sink and
countertop. Provide tables and seating.
Fitness Center
Fitness Centers are established at regional offices provided a need is
determined and funding for equipment and staffing is approved. Federal
Property Management Regulations (FPMR), Temporary Regulation D-76,
Appendix B. "Wellness/Physical Fitness Facilities," defines the criteria for
establishing a fitness center in GSA space. Additionally, Appendix B describes
the space acquisition process and buildout requirements for the center. As with
fitness centers in GSA space, a needs assessment should be performed for
fitness centers in a VA-owned facility. Space is allocated according the VA
Space Planning Criteria (VA Handbook 7610) and buildout conforms to VA
standards. Fitness center size is relative to station size and if it is a shared
facility, the size is determined by the number of agencies participating. The
fitness center should be located away from public areas and preferably close to
a secondary building exit. The design should allow room for exercise equipment
and well as space for free exercise such as aerobic classes.
General Operating Expense (GOE) funds are used to purchase equipment
for fitness centers. Careful consideration should be given to the equipment
purchased, selecting high quality products and the types of equipment preferred
by the users.
Page 2-26
VBA Design Guide