PRELIMINARY PROJECT SCHEDULE
Statement of Work
Phase 1: ____ weeks; Phase 2: ____ weeks; Phase 3: ____ weeks;
(Continued)
Phase 4: ____ weeks; Phase 5: ____ weeks
6.
EXCLUSIONS
The fabrication and installation of signs, site electrical and the engineering within
signs is by others. Interior signs not included in the scope of work are: illuminated
fire safety exit signs, signs related to or on equipment or fixtures, and signs relating to
employee operational matters. Exterior signs not included in the scope of work are:
parking stall identification, signs related to or on equipment or fixtures and striping and
pavement markings.
7.
PROJECT COORDINATOR
_____________________________________
NOTE
This statement of work is a general guide to assist in the development of a scope
for a project and facility. Close coordination with a Contacting Officer will help
tailor the document to meet current Contracting requirements and procedures.