PROJECT DATA SHEET NO. 1 (2 pages)
DATE:
____________________
LOCATION:
____________________________________
PROJECT NO:
______________
TITLE:
______________________________________________________________________
DESIGNER:
___________________________________________________________________
SUBMISSION NO:
_________
BUILDING NO.:
_________
BOECKH INDEX:
_________
AREA CALCULATIONS
BASEMENT:
________________m2 (GSF)
MECHANICAL:
___________________m2 (SF)
SUB-BSMT:
________________m2 (GSF)
CIRCULATION:
__________________m2 (SF)
PENTHOUSE:
_______________m2 (GSF)
CONSTRUCTION:
_________________m2 (SF)
FLOORS (TOTAL):
__________m2 (GSF)
DESIGN NET:
___________________m2 (SF)
AREA OF BLDG:
____________m2 (GSF)
AREA OF BLDG:
_________________m2 (SF)
(SUM OF ABOVE)
(SUM OF ABOVE)
PIPE SPACE:
______________m2 (GSF)
PROGRAM NET:
__________________m2 (SF)
HEIGHT OF PIPE SPACE:
____mm (FT)
ALTERATION:
___________________m2 (SF)
CONN. CORR.:
_____________m2 (GSF)
QUANTITATIVE BUILDING DESCRIPTION
ROOF:
____________________m2 (SF)
WINDOWS:
______________________m2 (SF)
EXT. WALL: _______________m2 (SF)
EST. DOORS:
____________________LEAVES
(INCLUDE WINDOWS & DOORS)
INT. WALL:
_______________m2 (SF)
INT. DOORS:
____________________LEAVES
(INCLUDE DOORS)
NO. OF FLOORS:
__________________
(EXCLUDE BSMT, SUB-BSMT,PENT,ETC)
_______________
STOPS EACH:
__________________________
CALCULATED A/C LOAD:
____KW (TONS)
NO. OF CHILLERS:
________________
TOTAL KW (TONS):
_____________________
NO. OF COOLING TOWERS:
__________
TOTAL KW (TONS):
_____________________
SOLAR PANELS:
_____________m2 (SF)
_________________
TOTAL kg/h (LBS/HR):
_______________
NO. OF FUEL OIL TANKS:
__________
TOTAL CAPACITY:
______________________
ATTACHMENT "A" PAGE 1 OF 7