DATE
COST SUMMARY SHEET
PROJECT NO.
LOCATION
PROJECT NAME
TYPE OF ESTIMATE
ESTIMATOR
GROSS AREA (New)
GROSSAREA(Alt.)
INDEX NO.
BUILDING NO./NOS.
ESTIMATE NO.
m2 (SQ.FT.)
m2 ( SQ.FT.)
$/m2 ($/GSF)
QUANTITY
UI
N
T
$/UNIT
SUBSYSTEM COST
SYSTEM COST
CODE
SYSTEM/SUBSYSTEM
A
B
C
D
01
FOUNDATION
10
STANDARD
20
SPECIAL
02
SUBSTRUCTURE
10
SLAB ON GRADE
20
BASEMENT EXCAVATION
30
BASEMENT WALLS
03
SUPERSTRUCTURE
10
FLOOR CONSTRUCTION
20
ROOF CONSTRUCTION
30
STAIR CONSTRUCTION
04
EXTERIOR CLOSURE
10
EXTERIOR WALLS
20
EXTERIOR DOORS AND WINDOWS
05
ROOFING
06
INTERIOR CONSTRUCTION
10
PARTITI ONS
20
30
SPECIALTIES
07
CONVEYING SYSTEMS
01
02
MOVING STAIRS/WALKS
03
04
PNEUMATIC TUBES
05
OTHER CONVEYING SYSTEMS
CEM -18c
VA FORM
Page 1
DEC-1995