JULY 2005
SOLICITATION FOR OFFERS
OUTPATIENT CLINIC
SFO NO. V101-183R-xxx-xxx-xx
[INSERT LOCATION OF FACILITY]
7.9.2.3 PROTECTIVE WALLCOVERING (WP):
Wainscot of rigid PVC protective wall covering (WP) shall be installed on walls in corridors and other
locations in accordance with Schedule C. Wainscot material and installation shall be as specified in
Schedule C.
7.9.3
MAINTENANCE AND REPLACEMENT:
All wall covering is to be maintained in "like new" condition for the life of the lease. Wall covering must be
replaced or repaired at the Lessor' expense, including moving and replacing furnishings (except where
s
wall covering has been damaged due to the negligence of VA), anytime during the occupancy by VA if it is
torn, peeling or permanently stained. Ceramic tile must be replaced or repaired if it is loose, chipped,
broken or permanently discolored. All repair and replacement work is to be done after working hours.
7.10 PAINTING:
Painting shall include field application of paints, stains, epoxies and other coatings for surfaces and
materials not supplied with factory finish or otherwise pre-finished. Wall surfaces shall be painted
throughout, except where wall coverings per Paragraph 7.9 above are called for in "Room Finish
Schedule" in Schedule C. Materials and application of paints and coating shall comply with VA Master
Construction Specifications 09900, Painting and 09815, High Build Glazed Coatings. Provide coating
types as scheduled in the specifications and as appropriate for the substrate and exposure.
Immediately prior to VA occupancy, all surfaces designated by VA for painting must be newly painted in
colors acceptable to VA. At a minimum, all painted surfaces including public areas must be repainted after
working hours at the Lessor' expense every three (3) years. This includes moving and replacement of
s
furniture.
7.11 HANDRAILS, WALL GUARDS AND CORNER GUARDS:
An estimate of base quantities of each type of handrail, wall guard and corner guard that should be
included in the proposed rental rate is indicated on Exhibit A of Schedule B-1. Adjustments will be made
at the end of the project based on actual measurement and payment will be made per the pre-negotiated
unit cost for these items.
Editing Note: review extent of protective wall covering
(rigid PVC) and wall guards (bumper rails). Consider
types and severity of anticipated use by carts,
wheelchairs, mobile equipment, furniture, etc., in
decision on type of protection to be used.
7.11.1 HANDRAILS AND WALL GUARDS:
Except in administrative areas, provide handrails and wall guards on both sides of all corridors. Provide
chair rail at locations indicated in Schedule C. Materials and installation shall comply with VA Master
Construction Specification 10260, Wall Guards and Corner Guards. Provide continuous reinforcing in the
wall attachment of handrails and bumper guards.
Editing Note: delete rooms or areas not used in
project.
Part I: Basic Solicitation Requirements Page 151 of 169
Lessor __________ Gov't. __________
__________ of __________ Pages