JULY 2005
SOLICITATION FOR OFFERS
OUTPATIENT CLINIC
SFO NO. V101-183R-xxx-xxx-xx
[INSERT LOCATION OF FACILITY]
Accept delivery of equipment on established dates;
Jointly with Contracting Officer, inspect the equipment upon delivery to check for damage and confirm
quantities;
Take steps to correct shortages or damage in transit;
Be responsible for proper storage and protection;
Provide any additional transportation;
Uncrate, assemble, and install equipment; and
Demonstrate proper operation of equipment to the Contracting Officer.
//
6.4 BUILDING SYSTEMS:
6.4.1
OPERATION OF BUILDING EQUIPMENT:
The Lessor shall furnish, operate, and maintain all building equipment and systems in accordance with
applicable technical publications, manuals, and standard procedures. Mains, lines, (electricity, gas, water,
and sewer utilities), and meters for utilities shall be provided by the Lessor. Exposed ducts, piping, and
conduits are not permitted in occupied spaces.
6.4.2
BUILDING SYSTEMS CERTIFICATION:
Lessor shall furnish, at no cost to VA, a certification by a registered professional engineer(s) that the
building and its systems, as designed and constructed, will satisfy the requirements of this lease.
6.4.3
BALANCING:
Ventilation and air conditioning balancing must be accomplished by an independent third party hired by the
Lessor and a report furnished before the building is occupied. Balancing companies must meet
certification requirements of Associates Air Balance Council (AABC) or the National Environmental
Balancing Bureau (NEBB).
Editing Note: Commissioning is an interdisciplinary
process involving the Lessor, the Design
Professionals and Contractor(s) retained by the
Lessor, and VA as Lessee. Building commissioning is
defined as a systematic quality assurance process for
achieving, verifying, and documenting the interactive
performance of the building systems in meeting the
design intent and the needs of the occupants.
To develop an optimum Commissioning Plan, the
unique needs of the proposed outpatient clinic must
depend on the size and complexity of the building and
the desired level of quality assurance. Commissioning
can be provided for all the systems in the building (full
commissioning) or to selected systems. The
Contracting Officer should consult with Office of
Facilities Management to establish the scope of
commissioning, if any, to be required by the SFO. If
Part I: Basic Solicitation Requirements Page 80 of 169
Lessor __________ Gov't. __________
__________ of __________ Pages