SPH 3
SITE SURVEYS, SUBSURFACE AND OTHER INVESTIGATIONS
The A/E shall arrange for and oversee the performance of topographic surveys, test
borings, test pits, soil tests, subsurface exploration and other such investigations as
he determines are required for the proper design of the project. Before such surveys
and investigations are undertaken, the A/E shall secure the written approval of the
Contracting Officer. After receiving the Contracting Officer's approval the A/E shall
follow either CP 1 or CP 5. Expenditures for this work shall not exceed the
authorized amount without prior written approval of the Contracting Officer. As
soon as available, the A/E shall submit to the Contracting Officer the original
drawings of topographic surveys and/or results of subsurface or other investigations.
The Government shall reimburse the A/E for cost of such surveys and/or
investigations.
(1) upon presentation by the A/E of an invoice therefor accompanied by
executed receipts, and,
(2) after receipt and acceptance by the Contracting Officer of the
pertinent data, drawings and recommendations.